§ 3-5. Approval of final plat.


Latest version.
  • (a)

    Application for approval of the final plat shall be submitted in writing to the planning commission at least ten days prior to the meeting at which it is to be considered.

    (b)

    The final plat and construction plans shall be distributed to the:

    (1)

    Planning commission, two copies of the final plat.

    (2)

    Designated engineering review agency, two copies of the final plat and one set of reproducible tracings of the construction plans.

    (3)

    Local health authority, one copy of the final plat and two copies of the water and sewer construction plans.