§ 3-4. Alternate procedures for construction.  


Latest version.
  • (a)

    Procedure A. [Procedure A is as follows:]

    (1)

    Construction plans approved by all agencies (see 3-3(a) above).

    (2)

    Post surety bond in a form acceptable to the City of Rayne and in an amount prescribed by the designated engineering review agency.

    (3)

    Receive approval of final plat (see 3-5 below).

    (4)

    Lots may be sold at this stage.

    (5)

    Construct improvements.

    (6)

    When construction is complete and in accordance with the approved plans and specifications and complies with the provisions of these regulations, the subdivider shall obtain written final approval and acceptance from the designated engineering review agency and submit such written approval to the planning commission. For a period of 12 months after the acceptance of the work the subdivider shall maintain all of the improvements, making repairs to such defects in material or workmanship as may develop or be discovered.

    The subdivider shall file with the planning commission a surety bond securing to the City of Rayne the satisfactory performance of this work for a period of one year from the date of such bond. The amount of the bond shall be ten percent of the cost of the improvements as determined by the designated engineering review agency.

    (b)

    Procedure B. [Procedure B is as follows:]

    (1)

    Construction plans approved by all agencies (see 3-3(a) above).

    (2)

    Construct improvements.

    (3)

    Acceptance of improvements and post maintenance bond (see 3-4(a)(6) above).

    (4)

    Receive approval of final plat (see 3-5 below).

    (5)

    Lots may be sold at this stage.